Location : Çumra - Konya
Employer: Çobanyıldızı Electric Production Co.
Role: Main Contractor
Contract Date: 11/07/2011
End of Contract: 01/06/2012
The Scope of Work:
  • 34,5 kV 2x477 MCM Energy Transmission Line Installation.
  • 50 MVA Power Transformer Installation.
  • 2x3MVA Power Transformers Installation.
  • Diesel Generator Sets and Sychronization Systems Installation.
  • 30,000 Mt. 34,5 kV 1x300 mm2 XLPE Underground Cable Installation.
  • LV,MV,Control,Signal,Fiber Optic and Data  Cables Installation.
  • HV Metal Enclosed, MCC Panels, Compensation Panels Installation.
  • I&C Systems  Installation.
  • Cable Tray and Conduit Installation.
  • Grounding and Lighting System Installation.