LOCATION : MALIKÖY – TEMELL? ANKARA
EMPLOYER : VATECH ELIN
ROLE : ELECTRICAL WORKS SUB-CONTRACTOR
CONTRACT DATE : 13/8/2002
PROJECT PERIOD : 12 MONTHS
Works that are continuing in this plant are detaily as follows:
CABLE TRAYS : These trays are industrial type and 200-300-600 mm wide trays are installed.
CABLE PULLING : Nearly 250 km. cable is pulled in this power plant for power, kontrol, command, coaxial and fiber-optic aims.
PANEL MOUNTING : Panels are mounted for 3 units which includes 2 gas turbine and 1 steam turbine. Panel sizes are variable.
TERMINATION : All termination works related with cables pulled are done by us.
ISOLATED BAR MOUNTING : All isolated bars which covers 3 units are connected with aluminum welding.
TRANSFORMER MOUNTING : 3 transformer mounting each has 276 MWA were completed.
DRY TYPE TRANSFORMER MOUNTING : Internal feeding is supplied by dry type transformers. Totaly 12 dry type transformer were mounted which have 2000 kVA power capacity.
GENERATOR EXCITATION SYSTEMS : Related with the warning systems of 3 units, excitation transfromers, excitation panels and DC connection were made.
SUB-STRUCTURE POWER FEEDING : All feeding cables of power plant and auxillary unIts (social buildings, workshops, offices, auxillary boiler, hydrogen building and water purification unit) were pulled, terminated.
WORKS IN COOLING TOWERS : All instrument equipments were mounted that belongs to cooling towers in addition, instrument pipes were also mounted and tested.
DIESEL GENERATOR INSTALLATION : Diesel Generator that has a capacity of 800 KVA was intalled.
CABLE CONDUIT MOUNTING : For cables, galvanised steel conduits are installed.
EARTHING : All equipments and panels in power plant were earthed and with earthing cable which has sectional area between 120 mm2 ile 10 mm2